Retain rockbmb at rank 2

Deciding
No context provided.
Who can edit?
Reply
Up
Share

Evidence for Retention

Argument-0005: Retention at Rank II

Report Date 2026/11/22
Submitted by rockbmb
Sponsored by N/A: no active Fellowship salary drawn

Member details

  • Matrix username: @[email protected]
  • Polkadot address: 13jBAtYJar4xujPaEx41FxjSt9PqU7LqJRbySJiVdMtuWN42
  • Current rank: 2
  • Date of initial induction: 2025/10/28
  • Date of last report: 2026/07/13
  • Link to last report: Argument-0004
  • Subsystems developed/maintained: Runtimes (Engineering, Security, Benchmarking); System chains

Reporting period

  • Start date: 2026/07/14
  • End date: 2026/11/22

Argument

I request retention at Rank II. My area is the correctness of SDK pallets and of the Fellowship runtimes: the code that holds user funds and executes what governance approves. The work is one responsibility at three points in time: review, before a defect merges; release, before it deploys; and security triage, after a report arrives.

I spent most of this period on the third: findings from the security working group's private repositories and from the bug bounty programme. I reproduced each report, fixed the real ones with regression tests, and refuted the false ones with the test or commit that proved them wrong. Due to their sensitive nature, the reports remain private in their corresponding Fellowship repository; the fixes and tests are public.

For Rank II, Section 6 of the Manifesto asks for deep familiarity with at least one major area of the protocol and for the increased availability of a would-be network maintainer. The two sections below are those terms exercised: the security triage is the availability, on the pallets I know best; the verification and release testing is the familiarity, applied before defects reach a release.

Security findings

Several of the reports concerned the governance pipeline, the referenda and scheduler pallets that enact every other decision. In pallet-referenda I fixed two related track-queue defects: a cancelled or killed referendum kept its queue entry (#13236, under review), and a referendum could stay marked as queued with no entry, where I took over an external contributor's PR and closed the second of the two paths that create the state (#12451, under review). A related capacity problem: referendum spam can fill a block's scheduler agenda and cost a passed referendum its enactment slot, so I reserved agenda capacity for governance tasks (#12854, under review). An E2E test covers the DecidingCount accounting these paths share (PET#684, merged).

A second group concerned funds and permissions. pallet-vesting locked the maximum of an account's genesis schedules instead of their sum (#13016, merged); pallet-broker wrote a revenue claim's storage changes even when its transfer failed (#13040, merged); pallet-psm never updated its admin origins after the underlying asset changed owner, fixed with a new pallet-assets owner-change callback (#13171, under review); and the relay runtimes' proxy hierarchy named NonTransfer a superset of Auction while the call filters enforced the opposite, fixed with property tests on both relays that compare every superset relation against the filters (runtimes#1281, merged).

One report claimed a proxy privilege escalation on the Asset Hubs. It was false, and the refutation is now a PET suite that covers add_proxy across all proxy type pairs (PET#691, merged).

Pallet verification and release testing

The same methods, applied at review time, find defects before enactment. pallet-psm mints the dotUSD stablecoin against collateral and is now live on Asset Hub:

  • Runtime invariants, checked on every upgrade: merged for pallet-psm (#12154) and pallet-recovery (#12490).
  • Quint state-machine models, with a harness that tests the pallet against them (#13291, #13292, under review). I settled a triage verdict with one of the model invariants this period.
  • The PET E2E suite, rewritten for the pallet's multi-instance form (PET#694, merged).

I maintain PET, which runs the E2E suites against every Fellowship release, and I triage its results when a release is cut. This period that covered runtimes 2.4 (PET#683, merged) and 2.5.1/2.5.2 (PET#711, PET#719, PET#720, merged), plus new suites for Fellowship referenda with real whitelisting (PET#663, merged) and for upgrades during relay cooldown windows (PET#666, merged). I reviewed other contributors' governance suites (PET#595, PET#670).

Voting record

Ranks Activity thresholds Agreement thresholds Member's voting activities Comments
I 90% N/A N/A No eligible referenda
II 80% N/A 0 of 0 (100%) No referenda on tracks open to Rank II during the period
III 70% 100%
IV 60% 90%
V 50% 80%
VI 40% 70%
Status
Decision14d
Confirmation
1hr
Attempts
0
Tally
100%Aye
0%Nay
Aye1
Nay0
  • 10.00%
  • 0.0%

    Threshold

  • 0.0%
Bare Aye1
Max Voters7
Check how referenda works here.
Call
Metadata
Timeline3
Curves
Comments